Work in the garden 2018

Before the work During the work Work completed
New greenhouse and paving
Before Soil moved from new greenhouse site The bed planted up
Southern arc flower bed
Before Work in progress The work completed
Paving replaced. Work carried out by Len Eade, Builder
Rabbit fencing
100 metres of rabbit fencing
Before After
Turf laid near tunnel
Before After
Returfing near Geriatric Bed
Before After
Weeping pear collapse
Before After
Secret garden revealed
Tussocks scythed
Tussocks scythed
Treework 1 Treework 2
Two days of treework by Fred Symes
New bed on old bonfire site1
Old bonfire site converted to new bed for shrubs
Owl 1 Owl 2
Owls placed on patrol